Project KW Wählitz

The industrial power plant KW Wählitz has a natural circulation boiler (150 tons / hour) and circulating, atmospheric fluidized bed firing. Our team supports the project with an IB-Advisor for the commissioning of the silo and the associated ancillary facilities.

Technical details:

Thermal input 119 MW

Electrical power 37.4 MW

Live steam parameter pressure: 115 bar,

Temperature: 535 ° C

Efficiency of the total plant 38.5 percent

Efficiency steam generator 91 percent

Project KW Ghana

The NV-EnerTech team supports the KW Ghana project in the field of assembly and commissioning by using a Mechanical Feeld Engineer. Current Projects / References 👉https: //bit.ly/2FISOFJ

Project KW Punta Catalina

The team of NV-EnerTech supports the KW Punta Catalina project through the use of an IB advisor. Current Projects / References 👉https: //bit.ly/2FISOFJ

Formula 1 at school

The EnerTech Racing team took part in the state championship of the 'Formula 1 at school' competition, where a total of 23 enthusiastic student teams presented their projects. The EnerTech Racing team was able to claim a good midfield place in its age group with its miniature racing car. 👏

New TÜV certificate for NV-EnerTech GmbH & Co. KG

As part of this year's TÜV audit, all criteria were met in order to take the TÜV certificate to a new level: ISO 9001: 2015. The auditors of TÜV Rheinland checked whether all requirements and standards that are relevant to the new ISO standard were complied with and implemented in the areas of quality management and work safety.. "We are very pleased that we were able to implement the change to the new ISO standard so smoothly," explains Susanne Marquard, the quality management representative of NV-EnerTech. "Our goal is to continue to optimize the processes in our company on an ongoing basis Implement work  health and safety guidelines at the highest level.